|
New headsail 2009/10 |
| New SS rigging and check 2010 |
| Warp regalvanised 2011 |
| Heat exchanger removed & serviced 2011 & end mouldings replaced, salt water pump serviced. Full engine check / service MGE Marine late 2011. |
| New alternator (original good & held as spare) |
| Toilet and pump replaced |
| Holding tank added, electric macerator pump out |
| New fresh water pump & pressure tank (higher pressure) |
| New gas califont 2011 |
| New mainsail cover 2011 |
| New capstan breaker |
| Salt water pressure pump (deck wash) |
| Rudder removed & new bearings fitted |
| Prop removed and resized (dramatic improvement in smoothness and noise with actual gain in performance) |
| Stuffing box serviced approx 2009. |